Kaiser Medical Center Central Utility Plant Expansion
Roseville, CA
- Expansion of Existing Central Utility Plant to nearly double mechanical and plumbing utilities
- Components Included:
- Two 1,000 ton water cooled chillers, cooling towers and associated pumps
- One 12M BTUH heating hot water boiler and pumps
- Four additional 9.5 BHP steam boilers and deaerator/feed water tank
- Bulk oxygen yard, nitrous oxide and nitrogen manifolds
- 20,000 gallon fuel oil tanks, pumps and ancillaries
- Underground distribution for chilled water, heating water, steam and medical gases to other campus buildings
![campus map showing all buildings](https://www.ra-solutions.com/wp-content/uploads/2022/03/IMG_6653-Web.jpg)
![heating hot water boiler](https://www.ra-solutions.com/wp-content/uploads/2022/03/Boiler-Web.jpg)
![central plant cooling tower and fuel oil tank](https://www.ra-solutions.com/wp-content/uploads/2022/03/IMG_6663-Web.jpg)
![central plant mechanical equipment yard](https://www.ra-solutions.com/wp-content/uploads/2022/03/IMG_6664-Web.jpg)
![rooftop mechanical utilities](https://www.ra-solutions.com/wp-content/uploads/2022/03/Picture-003-Web.jpg)